Galway Metals Intersects 6.1 g/t Gold over 19.0m Including 18.3 g/t over 3.0m
Galway Metals reported high‑grade drill results from eight holes at the South Deposit of the Clarence Stream gold project (April 21, 2026). Highlight intercepts include CS‑418 at 6.1 g/t Au over 19.0m (including 18.3 g/t over 3.0m and 20.6 g/t over 1.0m) and other significant hits (e.g., CS‑426 4.2 g/t over 4.0m). The company says these near‑surface, continuous high‑grade results bolster confidence in the deposit core and support an ongoing updated Mineral Resource Estimate with four rigs operating and many assays pending. The news reinforces the project’s district‑scale potential and could positively influence investor sentiment around Galway and gold exposure more broadly, by highlighting potential for resource expansion and advancement toward development.